Wall Removal & Beams

Opening up rooms in an Ottawa house: the permit, who designs the beam, the posts and supports it needs, and what to compare in quotes.

Too few published Ottawa prices: get written quotes The City says it needs about five working days to review a complete permit submission; the work itself depends on the design and the inspections

Too few published Ottawa prices to quote a range. Compare quotes on the same design, beam and post plan, temporary support, permit and patching. Where the job needs a building permit, the City's fee for alterations is $12.75 per $1,000 of construction value, minimum $117 (fee schedule dated January 1, 2026). Valuation is the total of materials, labour, overhead and professional fees.

Find a Carpenter

About Wall Removal & Beams

When a wall comes out to join a kitchen and dining room, or two smaller rooms, the permit comes first. On ottawa.ca's list of building permit projects, "adding or removing walls, i.e., creating different room sizes and/or uses" appears as an interior structural alteration, and the list does not split load-bearing walls from partitions. Confirm with Building Code Services before any wall comes out.

Where the wall carries load, a beam and posts take its place. The design that goes in with the permit application comes from a qualified, registered designer (BCIN), an engineer or an architect, or from you, for a house you own (Ontario Building Code, Division C, 3.2.5.1.(3)(b)). We found nothing on ottawa.ca saying the City demands an engineer's stamp for every beam, so ask the City what it will accept for yours.

The Building Code sets a few minimums the drawings will show: beam ends bear at least 89 mm on their supports, and a wood column is at least 140 × 140 mm (184 mm round) unless calculations show a smaller one works, and never narrower than the beam it holds. The beam size itself comes from the design for your house, not from a chart on a website.

The City asks for inspections at key stages, booked 48 hours ahead. Items that show up on a quote: the design, the permit, temporary support while the wall comes out, the beam and posts, moving wiring, ducts or plumbing, and patching drywall, paint and floors afterwards.

What This Work Covers

  • Permit step confirmed with the City before the wall comes out
  • Beam designed by a BCIN designer, engineer or architect, or by you for your own house
  • Temporary support while the wall is removed
  • Beam end bearing and post sizes from the approved design
  • Patching, inspection bookings and clean-up listed in the quote